Winter Project

just think though if you put 20k back in it it will look like this
8-Picture%20389.jpg

6-Picture%20393.jpg

11-Picture%20394.jpg

6-Picture%20397.jpg

25-Picture%20396.jpg

29-Picture%20398.jpg

18-Picture%20392.jpg

10-Picture%20400.jpg

25-Picture%20390.jpg

23-Picture%20391.jpg
 
Someone paid £97 for that? as stated previously you could get an MOT failure for less than that. Floor removed? looked like the floor had rusted out of it.
 
Someone paid £97 for that? as stated previously you could get an MOT failure for less than that. Floor removed? looked like the floor had rusted out of it.


no it has had the floor cut out to make it flat nothing run under the floor,exhaust and everthing is inside.

il give anybody £100 for a fully stripped out shell,saves me doing
it takes about 2 full days and then youve got to get rid of all the crap.
 
mmm.... GSXR1000 engine in the back.... fuel cell in the front..... central driving position.... wide arched..... turbo......OOOOOOOOOOOH!!!! the want for £100 spare and alots of time is sooooo annoying..

i want that for a V6 road car, or a motorbike engined road car.... or a micra wheelie machine..... or a micra 4x4.... or oh god im gonn pass out with excitement... LOL
 
Back
Top